System Study: High-Pressure Coolant Injection 1998???2013
[摘要] This report presents an unreliability evaluation of the high-pressure coolant injection system (HPCI) at 25 U.S. commercial boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.
[发布日期] 2015-01-31 [发布机构]
[效力级别] [学科分类]
[关键词] HIGH PRESSURE COOLANT INJECTION;BWR TYPE REACTORS;RELIABILITY;DEMAND;EVALUATION;FAILURES boiling water reactor;high-pressure coolant injection;operating experience;unreliability [时效性]