已收录 273503 条政策
 政策提纲
  • 暂无提纲
Reedsport PB150 Deployment and Ocean Test Project
[摘要] As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport (OR) was planned to consist of 10 PowerBuoys (Phase II)1, located 2.5 miles off the coast. U.S. Department of Energy (DOE) funding under a prior DOE Grant (DE-FG36-08GO88017) along with funding from PNGC Power, an Oregon-based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. The design and fabrication of the first PowerBuoy and factory testing of the power take-off subsystem were completed, and the power take-off subsystem was successfully integrated into the spar at the fabricator???s facility in Oregon. The objectives of this follow-on grant were: advance PB150B design from TRL 5/6 to TRL 7/8; deploy a single PB150 and operate autonomously for 2 years; establish O&M costs; collect environmental information; and establish manufacturing methodologies.
[发布日期] 2016-06-03 [发布机构] 
[效力级别]  [学科分类] 再生能源与代替技术
[关键词] wave energy;wave energy harvesting;marine hydrokinetic;power take-off [时效性] 
   浏览次数:25      统一登录查看全文      激活码登录查看全文