This report provides the results of a detailed Level II analysis of scour potential at structure HINETH00040011 on Town Highway 4 crossing Lewis Creek, Hinesburg, Vermont (figures 1�C8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.


The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 38.4-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture.


In the study area, Lewis Creek has an incised, straight channel with a slope of approximately 0.001 ft/ft, an average channel top width of 60 ft and an average channel depth of 7 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 47.0 mm (0.154 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 3, 1996, indicated that the reach was stable.


The Town Highway 4 crossing of Lewis Creek is an 84-foot-long, two-lane bridge consisting of one 82-foot steel-beam span (Vermont Agency of Transportation, written communication, December 15, 1995). The bridge is supported by vertical, concrete abutments with wingwalls and spill-through embankments at each abutment. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 15 degrees.


The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) at the downstream left and right wingwalls and the downstream right bank. Scour protection also included type-3 stone fill (less than 48 inches diameter) at the left and right upstream wingwalls, both abutments, both upstream banks, and the left bank downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.


Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.


Contraction scour for all modelled flows ranged from 0.0 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 14.1 to 18.2 ft. Right abutment scour ranged from 9.9 to 13.4 ft. The worst-case abutment scour occurred at left abutment for the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled ��Scour Results��. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.


It is generally accepted that the Froehlich equation (abutment scour) gives ��excessively conservative estimates of scour depths�� (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.