Lean manufacturing analysis to reduce waste on production process of fan products
[摘要] This research is based on case study that being on electrical company. One of the products that will be researched is the fan, which when running the production process there is a time that is not value-added, among others, the removal of material which is not efficient in the raw materials and component molding fan. This study aims to reduce waste or non-value added activities and shorten the total lead time by using the tools Value Stream Mapping. Lean manufacturing methods used to analyze and reduce the non-value added activities, namely the value stream mapping analysis tools, process mapping activity with 5W1H, and tools 5 whys. Based on the research note that no value-added activities in the production process of a fan of 647.94 minutes of total lead time of 725.68 minutes. Process cycle efficiency in the production process indicates that the fan is still very low at 11%. While estimates of the repair showed a decrease in total lead time became 340.9 minutes and the process cycle efficiency is greater by 24%, which indicates that the production process has been better.
[发布日期]  [发布机构] Department of Industrial Engineering, Universitas Sumatera Utara, Campus USU, Almamater Rd., Medan, Sumatera Utara; 20155, Indonesia^1;Department of Accounting, Universitas Sumatera Utara, Campus USU, Almamater Rd., Medan, Sumatera Utara; 20155, Indonesia^2;Department of Information Technology, Universitas Sumatera Utara, Campus USU, University Rd., Sumatera Utara, Medan; 20155, Indonesia^3
[效力级别] 工业技术 [学科分类] 工业工程学
[关键词] Leadtime;Manufacturing methods;Non-value added;Process cycles;Process mapping;Production process;Value stream mapping;Value-added activity [时效性] 
   浏览次数:70      统一登录查看全文      激活码登录查看全文