The expected difference between the SLTF and MTPT drum scheduling disciplines (digest edition).
[摘要] This report is a sequel to an earlier report [Fuller, 1971] that develops a minimal-total-processing-time (MTPT) drum scheduling algorithm. A quantitative comparison between MTPT schedules and shortest-latency-time-first (SLTF) schedules, commonly acknowledged as good schedules for drum-like storage units, is presented here. The analysis develops an analogy to random walks and proves several asymptotic properties of collections of records on drums. These properties are specialized to the MTPT and SLTF algorithms and it is shown that for sufficiently large sets of records, the expected processing time of a SLTF schedule is longer than a MTPT schedule by the expected record length. The results of a simulation study are also presented to show the difference in MTPT and SLTF schedules for small sets of records and for situations not covered in the analytic discussion.
[发布日期] [发布机构]
[效力级别] [学科分类] 计算机科学(综合)
[关键词] [时效性]