已收录 268921 条政策
 政策提纲
  • 暂无提纲
Preliminary analytical study on the feasibility of using reinforced concrete pile foundations for renewable energy storage by compressed air energy storage technology
[摘要] Compressed air energy storage technology is one of the promising methods that have high reliability, economic feasibility and low environmental impact. Current applications of the technology are mainly limited to energy storage for power plants using large scale underground caverns. This paper explores the possibility of making use of reinforced concrete pile foundations to store renewable energy generated from solar panels or windmills attached to building structures. The energy will be stored inside the pile foundation with hollow sections via compressed air. Given the relatively small volume of storage provided by the foundation, the required storage pressure is expected to be higher than that in the large-scale underground cavern. The high air pressure typically associated with large temperature increase, combined with structural loads, will make the pile foundation in a complicated loading condition, which might cause issues in the structural and geotechnical safety. This paper presents a preliminary analytical study on the performance of the pile foundation subjected to high pressure, large temperature increase and structural loads. Finite element analyses on pile foundation models, which are built from selected prototype structures, have been conducted. The analytical study identifies maximum stresses in the concrete of the pile foundation under combined pressure, temperature change and structural loads. Recommendations have been made for the use of reinforced concrete pile foundations for renewable energy storage.
[发布日期]  [发布机构] Department of Civil Engineering, Nazarbayev University, 53 Kabanbay batyr ave., Astana; 010000, Kazakhstan^1
[效力级别] 土木建筑工程 [学科分类] 
[关键词] Building structure;Complicated loadings;Economic feasibilities;Prototype structures;Renewable energy storages;Temperature changes;Temperature increase;Underground cavern [时效性] 
   浏览次数:37      统一登录查看全文      激活码登录查看全文