已收录 268921 条政策
 政策提纲
  • 暂无提纲
Causes of shortage and delay in material supply: a preliminary study
[摘要] Shortage and delay in materials supply is argued to be one of the most important factors that lead to delay in construction project delivery globally. However, the relevant underlying reasons vary from country to country. As such, this paper summarises the outcomes of a study that targeted identifying causes of shortage and delay in materials supply in Brunei Darussalam. The study was conducted through fifteen semi-structured interviews of contractors and materials suppliers in Brunei. The study identified six causes of shortageof materials and nine causes of delay in materials supply in Brunei. The most importantcausefor shortage of materials relates to the origin or availability of construction materials. On the other hand, the most influential cause of delay in material supply was found to be poor materials procurement and inventory management system, which has other underlying reasons such as late identification of the type of materials needed. The observations are expected to help in formulating or reviewing relevant policies, in order to ensure on-Time project delivery.
[发布日期]  [发布机构] Civil Engineering Programme Area, Faculty of Engineering, Universiti Teknologi Brunei, Tungku Highway, Gadong, Brunei Darussalam; BE1410, Brunei^1
[效力级别] 土木建筑工程 [学科分类] 
[关键词] Causes of delays;Construction projects;Inventory management systems;Material supply;Materials procurement;Materials supplies;On-time project;Semi structured interviews [时效性] 
   浏览次数:26      统一登录查看全文      激活码登录查看全文