Analysis and Risk Evaluation on the Case of Alteration, Revitalization and Conversion of a Historic Building in Gdańsk
[摘要] Each investment plan, including the one concerning a building, is exposed to the consequences of various types of threats taking place. Therefore, in the case of some large-scale, atypical and complicated building ventures, some actions included in the procedure of risk management should be taken (identifications, analysis, measurements, control and supervision of the risk). This will allow for the risk to be eliminated or limited. While preparing a building venture, an investor does not possess full information about the course of events on each stage of investment completion. The identification of the above-mentioned unknowns, subjecting them to quantification and specifying the method of dealing with them, allows an investor to increase the effectiveness of the intended plan. The enterprise discussed in this article and analyzed in the context of risk, concerns alteration, revitalization and conversion for office purposes of two buildings located in Gdask at 1 and 2 Lastadia Street. These buildings are situated on the area of historical urban layout of Gdask, in the northern-eastern part of Stare Przedmiecie District (Old Suburb), about 800 meters south from Dlugi Targ Street and 200 meters west from The Old Motlawa River. The investor is "Gdaskie Melioracje Ltd.", a limited liability company, which belongs to the Council of Gdask. In order to increase the effectiveness of the intended investment venture, while organizing the investment process, the investor commissioned preparation of an analysis and risk evaluation connected with the above-mentioned intention. Based on an on-site visit, the opinions of experts, who have been involved in the process of the preparation of the investment, studies of the available monographies about the technical condition of the buildings at 1 and 2 Lastadia Street and their own experiences, the authors identified 54 types of relevant risks, which have been systematized into 10 subject groups (among others- investor's risk due to the designing process, location of the investment, third party or investor business activity, force majeure, political, legal, financial, technical). The scope of the study includes the identification, analysis and risk evaluation connected with planning and completion of alteration, revitalization and conversion of a historic building located at 2 Lastadia Street for the office purposes. The risk has been analyzed from the investor's perspective. The authors used a method of preliminary analysis and risk evaluation PHA (Preliminary Hazard Analysis) and the expert method.
[发布日期] [发布机构] Gdansk University of Technology, Faculty of Civil and Environmental Engineering, Narutowicza 11/12, Gdask; 80-233, Poland^1
[效力级别] [学科分类] 土木及结构工程学
[关键词] Business activities;Designing process;Full informations;Historic buildings;Limited liability companies;Preliminary analysis;Preliminary hazard analysis;Technical conditions [时效性]