Order No. 1063 on grid connection of wind turbines and on surcharge for wind-generated electricity.
[摘要] This Order lays out definition and rules on the implementation of wind turbines on land and at sea in regards to energy connection via transmission grids. Windturbines that are connected to the grid or to a consumer installation after 20 May 2003 must have their own billing metering in adherence to Energi.net regulations. Windturbines of less than 25kW are exempt from this regulation. Scrapping schemes for onshore windturbines of 150kW or less may acquire certification thereof if oscrapped betwe
[发布日期] 2010-09-15 [发布机构]
[效力级别] [学科分类]
[关键词] Energy conservation/energy production;Renewable energy;Tax/levy;Ecofriendly products/ecofriendly processes;Transport/storage [时效性] Effective