已收录 273156 条政策
 政策提纲
  • 暂无提纲
The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories
[摘要] The integrated circuit (IC) manufacturing industry is one of the biggest output industries in this century. The 300mm wafer fabs is the major fab size of this industry. The automatic material handling system (AMHS) has become one of the most concerned issues among semiconductor manufacturers. The major lot delivery of 300mm fabs is used overhead hoist transport (OHT). The traffic jams are happened frequently due to the wide variety of products and big amount of OHTs moving in the fabs. The purpose of this study is to enhance the delivery performance of automatic material handling and reduce the delay and waiting time of product transportation for both hot lots and normal lots. Therefore, this study proposes an effective OHT dispatching rule: preemptive stocker dispatching (PSD). Simulation experiments are conducted and one of the best differentiated preemptive rule, differentiated preemptive dispatching (DPD), is used for comparison. Compared with DPD, The results indicated that PSD rule can reduce average variable delivery time of normal lots by 13.15%, decreasing average variable delivery time of hot lots by 17.67%. Thus, the PSD rule can effectively reduce the delivery time and enhance productivity in 300 mm wafer fabs.
[发布日期]  [发布机构] National Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan^1;National Kaohsiung Marine University, Kaohsiung, Taiwan^2;Chihlee University of Technology, New Taipei City, Taiwan^3
[效力级别] 化学 [学科分类] 
[关键词] 300 mm semiconductor manufacturing;AMHS;Automatic material handling systems;Manufacturing industries;Overhead hoist transports;Product transportation;Semiconductor manufacturers;Stocker [时效性] 
   浏览次数:26      统一登录查看全文      激活码登录查看全文