已收录 273081 条政策
 政策提纲
  • 暂无提纲
A risk-value-based methodology for enterprise-level decision-making
[摘要] Despite its long lasting existence, aerospace remains a non-commoditized field. Tosustain their market domination, the major companies need to commit to large capital investments and constant innovation, in spite of multiple sources of risk and uncertainty, andsignificant chances of failure. This makes aerospace programs particularly risky. However, successful programs more than compensate the costs of disappointing ones. In order to maximize the chances of a favorable outcome, a business-driven, multi-objective, and multi-risk approach is needed to ensure success, with particular attention to financial aspects. Additionally, aerospace programs involve multiple divisions within a company. Besides vehicle design, finance, sales, and production are crucial disciplines with decision power and influence on the outcome of the program. They are also tightly coupled, and the interdependencies existing between these disciplines should be exploited to unlock as muchprogram-level value potential as possible. An enterprise-level approach should, therefore,be used. Finally, suborbital tourism programs are well suited as a case study for this research. Indeed, they are usually small companies starting their projects from scratch. Using a full enterprise-level analysis is thus necessary, but also more easily feasible than for larger groups. These motivations lead to the formulation of the research objective: to establish a methodology that enables informed enterprise-level decision-making under uncertainty and provides higher-value compromise solutions. The research objective can be decomposed into two main directions of study. First, current approaches are usually limited to the design aspect of the program and do not provide the optimization of other disciplines. This ultimately results in a de-facto sequential optimization, where principal-agent problems arise. Instead, a holistic implementation is proposed, which will enable an integrated enterprise-level optimization. The second part of this problem deals with decision-making with multiple objectives and multiple risks. Current methods of design under uncertainty are insufficient for this problem. First, they do not provide compelling results when several metrics are targeted. Additionally, variance does not properly fit the definition of risk, as it captures both the upside and downside uncertainty. Instead, the deviation of the Conditional Value at Risk (called here downside deviation) is used as a measure of value risk. Furthermore, objectives are categorized and aggregated into risk and value scores to facilitate convergence, visualization, and decisionmaking. As suborbital vehicles are complex non-linear systems, with many infeasible conceptsand computationally expensive M&S environments, a time-efficient way to estimatethe downside deviation needs to be used. As such, a new uncertainty propagation structureis used that involves regression and classification neural networks, as well as a Second-Order Third-Moment (SOTM) technique to compute statistical moments. The proposed process elements are combined, and integrated into a method followinga modified Integrated Product and Process Development (IPPD) approach, using five mainsteps: establishing value, generating alternatives, evaluating alternatives, and making decisions.A new M&S environment is implemented and involves a design framework to whichseveral business disciplines are added. A bottom-up approach is used to study the four research questions of this dissertation.At the lowest level of the implementation, an enhanced financial analysis is evaluated.Common financial valuation methods used in aerospace have heavy limitations: all of themrely on a very arbitrary discount rate despite its critical impact on the final value of the NPV.The proposed method provides detailed analysis capabilities and helps capture more valueby enabling the optimization of the company’s capital structure. A sensitivity analysis alsoverifies the importance of the added factors in the proposed method. The second implementation step is to time-efficiently evaluate downside deviation. Assuch, regression and classification neural networks are implemented to estimate the basecosts of the vehicle and speed up the vehicle sizing process. Business analyses are alreadytime-efficient and therefore maintained. These neural networks ultimately show good validationprediction root-mean-square error (RMSE), which confirms their accuracy. The SOTM method is also checked and shows a downside deviation prediction accuracy equivalentto a 750-point Monte Carlo method. From a computation time standpoint, the use ofneural networks is required for a reasonable convergence time, and the SOTM used jointlywith neural networks results in an optimization time below 1 hour. The proposed approach for making risk/value trade-offs in the presence of multiplerisks and objectives is then tested. First, the importance of using downside deviation isdemonstrated by showing the risk estimation error made when using the standard deviationrather than the actual downside deviation. Additionally, the use of risk and value scoresalso helps decision-making from a qualitative and quantitative point of view. Indeed, it facilitatesvisualization by supplying a two-dimensional Pareto frontier, while still being ableto color it to observe program features and cluster patterns. Furthermore, the problem withrisk and value scores provides more optimal solutions, compared to the non-aggregatedcase, unless very large errors in weightings are committed. Finally, the proposed methodprovides good capabilities for identifying, ranking, and selecting optimal concepts. The last research question presents the following interrogation: does an enterpriselevelapproach help improve the optimality of the overall program, and does it result insignificantly different decision-making? Two elements of the enterprise-level approach aretested: the integrated optimization, and the use of additional enterprise-level objectives.In both cases, the resulting Pareto frontiers are significantly dominating their counterparts,demonstrating the usefulness of the enterprise-level approach from a quantitative pointof view. It also shows that the enterprise-level approach results in significantly differentdecisions, and should, therefore, be applied early in the design process. Hence, the method provided the capabilities sought in the research objective. Thisresearch resulted in contributions in the financial analysis of aerospace programs, in designunder multiple sources of uncertainty with multiple objectives, and in design optimizationby proposing the adoption of an enterprise-level approach.
[发布日期]  [发布机构] University:Georgia Institute of Technology;Department:Aerospace Engineering
[效力级别] Suborbital [学科分类] 
[关键词] Aerospace;Suborbital;Multi-disciplinary design;Multi-objective optimization;Risk;Enterprise-level decision-making;Applied corporate finance;Uncertainty propagation [时效性] 
   浏览次数:12      统一登录查看全文      激活码登录查看全文