已收录 274775 条政策
 政策提纲
  • 暂无提纲
Reconstruction of Power Supply System 20 kV Distribution to Compare Power Rate and Fall Voltage PT. PLN (Persero) Area Dumai
[摘要] Electricity in Bagan Siapi city fire is channeled through a feeder distribution system of 20 kV. The main supply of Bagan Siapi-api city comes from PLTD unit Bagan Siapi fire which is A ± 1.5 kms from the load center and Duri Substation is A ± 102 kms from Bagan Siapi-api city through Hubung Ujung Tanjung. The long distances between the Duri Mainstation and Bagan Siapiapi city resulted in a 14.85 kV end-voltage and a 988.7 kW loss. Voltage losses resulted in ineffective service to the consumer and large network power losses being uneconomical for power delivery operations. The result of end voltage calculation is 10.42 kV and the power loss is 988.7 kW. After the New Substation operates, reconfiguration-1 produces the lowest end-voltage calculation of 16.21 kV and a power loss of 136.59 kW, while reconfiguration-2 produces a low end stress calculation of 17.37 kV and a power loss of 56.93 kW.
[发布日期]  [发布机构] University Lancang Kuning, Pekanbaru; 28265, Indonesia^1
[效力级别]  [学科分类] 环境科学(综合)
[关键词] feeder 20 kV;Power-losses;reconfiguration;substation;Voltage drop [时效性] 
   浏览次数:35      统一登录查看全文      激活码登录查看全文