已收录 272983 条政策
 政策提纲
  • 暂无提纲
Semi top-down method combined with earth-bank, an effective method for basement construction.
[摘要] Choosing an appropriate method of deep excavation not only plays a decisive role in technical success, but also in economics of the construction project. Presently, we mainly base on to key methods: "Bottom-up" and "Top-down" construction method. Right now, this paper presents an another method of construction that is "Semi Top-down method combining with earth-bank" in order to take the advantages and limit the weakness of the above methods. The Bottom-up method was improved by using the earth-bank to stabilize retaining walls instead of the bracing steel struts. The Top-down method was improved by using the open cut method for the half of the earthwork quantities.
[发布日期]  [发布机构] Faculty of Civil Engineering, Ton Duc Thang University, Ho Chi Minh City, Viet Nam^1;Faculty of Civil Engineering, Ho Chi Minh City University of Technology, Ho Chi Minh City, Viet Nam^2
[效力级别] 运输工程 [学科分类] 
[关键词] Bottom up;Bottom up methods;Construction method;Construction projects;Deep excavation;Open-cut method;Steel struts;Top-down methods [时效性] 
   浏览次数:20      统一登录查看全文      激活码登录查看全文