已收录 273134 条政策
 政策提纲
  • 暂无提纲
Cost of enlarged operating zone for an existing Francis runner
[摘要] Traditionally, hydro power plants have been operated close to best efficiency point, the more stable operating condition for which they have been designed. However, because of changes in the electricity market, many hydro power plants operators wish to operate their machines differently to fulfil those new market needs. New operating conditions can include whole range operation, many start/stops, extensive low load operation, synchronous condenser mode and power/frequency regulation. Many of these new operating conditions may impose more severe fatigue damage than the traditional base load operation close to best efficiency point. Under these conditions, the fatigue life of the runner may be significantly reduced and reparation or replacement cost might occur sooner than expected. In order to design reliable Francis runners for those new challenging operating scenarios, Andritz Hydro has developed various proprietary tools and design rules. These are used within Andritz Hydro to design mechanically robust Francis runners for the operating scenarios fulfilling customer's specifications. To estimate residual life under different operating scenarios of an existing runner designed years ago for best efficiency base load operation, Andritz Hydro's design rules and tools would necessarily lead to conservative results. While the geometry of a new runner can be modified to fulfil all conservative mechanical design rules, the predicted fatigue life of an existing runner under off-design operating conditions may appear rather short because of the conservative safety factor included in the calculations. The most precise and reliable way to calculate residual life of an existing runner under different operating scenarios is to perform a strain gauge measurement campaign on the runner. This paper presents the runner strain gage measurement campaign of a mid-head Francis turbine over all the operating conditions available during the test, the analysis of the measurement signals and the runner residual life assessment under different operating scenarios. With these results, the maintenance cost of the change in operating mode can then be calculated and foreseen by the power plant owner.
[发布日期]  [发布机构] Andritz Hydro Canada Inc., 6100 Trans Canada Hwy., Pointe-Claire; QC; H9R 1B9, Canada^1;Vattenfall Vattenkraft AB, Norra Torget 4, Kristinehamn; 681 30, Sweden^2;Vattenfall AB, R and D Laboratories, Älvkarleby; 814 26, Sweden^3
[效力级别]  [学科分类] 
[关键词] Base load operations;Best efficiency point;Gauge measurements;Mechanically robust;Off-design operating conditions;Operating condition;Strain gage measurements;Synchronous condensers [时效性] 
   浏览次数:11      统一登录查看全文      激活码登录查看全文