已收录 268922 条政策
 政策提纲
  • 暂无提纲
Engineering Geological Assessment of Diversion Tunnel of Bakhtiari Damsite (Biggest Two-Arch Concrete Dam in Southern Iran)
[摘要] Bakhtiari dam is located on the Bakhtiari river, 120 km away from the north of the Andimeshk city. Upper diversion tunnel of this dam with large cross section (13.7 m excavation diameter) and more than 1 km length is a huge construction. The tunnel is placed in the Sarvak formation carbonate rocks of Bangestan group which passes through seven different geological zones with various specifications(SV1, SV2, SV3, SV4, SV5, SV6, and SV7). Joint studies show two main discontinuit including bedding and a main group of joint(J1) togetherwithrandomjoints(faultsandfractures). Most of discontinuities have been filled mainly by calcite or calcite and clay. Data deduced from testing and analysis shows good-to-excellent RQD classes with 75 to 90 values. Based on RMR andQmethods, generally rock masses have good to very good quality with 61 to 95 values for RMR and 10 to 35 values forQ. Based on conducted stability analysis, suitable supports were suggested for tunnel by RMR andQmethods. As a result, it can be concluded that all units have a good stability. Therefore, systematic rock bolting with 40–50 mm unreinforced shotcrete has been proposed for some special place. For rock support, according to RMR method, 3 m rock bolts in crown, 2.5 m spacing and with 50 mm shotcrete in crown has been proposed also 3 m rock bolts, based onQmethod, 2.3-2.4 m spacing with systematic Bolting without shotcrete or 40 mm unreinforcedshotcretein some units, has been proposed. According to RMR method, for SV5 zone with very good and excellent quality, local 33 bolting without shotcrete and 3m rock bolts, 3 m spacing and spot bolting according toQmethod has been proposed.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 地质学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文