已收录 268921 条政策
 政策提纲
  • 暂无提纲
Algorithm of probabilistic assessment of fully-mechanized longwall downtime
[摘要] The problem of increasing the load on a long fully-mechanized longwall has several aspects, one of which is the improvement of efficiency in using available stoping equipment due to the increase in coefficient of the machine operating time of a shearer and other mining machines that form an integral part of the longwall set of equipment. The task of predicting the reliability indicators of stoping equipment is solved by the statistical evaluation of parameters of downtime exponential distribution and failure recovery. It is more difficult to solve the problems of downtime accounting in case of accidents in the face workings and, despite the statistical data on accidents in mine workings, no solution has been found to date. The authors have proposed a variant of probability assessment of workings caving using Poisson distribution and the duration of their restoration using normal distribution. The above results confirm the possibility of implementing the approach proposed by the authors.
[发布日期]  [发布机构] Siberian State Industrial University, 42 Kirova Street, Novokuznetsk; 654007, Russia^1;National Mine Rescue Center, 5 Gornospasatelnaya Street, Novokuznetsk; 654028, Russia^2
[效力级别] 地球科学 [学科分类] 
[关键词] Exponential distributions;Failure recovery;Machine operating;Probabilistic assessments;Probability assessments;Reliability indicators;Statistical datas;Statistical evaluation [时效性] 
   浏览次数:44      统一登录查看全文      激活码登录查看全文