Numerical Optimization of Broken and Difficult for Stope Mining in Underground Metal Mines
[摘要] In a metal mine, there is a great risk of mining hidden resources caused by unreasonable mining in the early stage. In order to effectively and safely mine this part of the resources, it is based on investigating the current status of mining and delineating the area of instability and collapse, the area is firstly grouted and strengthened and temporarily supported, and then the first mining site and its mining method in the hidden danger area are given. The 3D model of the original goaf was constructed, and the numerical analysis model was introduced and numerical simulation was carried out, the results show that: 1) grouting reinforcement treatment and temporary support measures can effectively control the surrounding rock to continue collapse; 2) the original three-dimensional visualization model of the original goaf can reflect the real situation of the first mining stope; 3) based on the results of comprehensive numerical analysis, the stope structure parameters of the first stope are obtained, the length, width and height are 31×7.5×28.8m and 36×7.5×28.8m, respectively. The optimized result realizes the safe mining of the stope and provides reference and reference for the mining of similar stope.
[发布日期] [发布机构] School of Environment and Resources, Xiang Tan University, Xiang Tan; 411105, China^1;Institute of Public Safety, Tsinghua University, 100062, China^2
[效力级别] [学科分类] 环境科学(综合)
[关键词] Grouting reinforcements;Hidden resources;Numerical analysis models;Numerical optimizations;Structure parameter;Temporary support;Three dimensional visualization modeling;Underground metal mines [时效性]