已收录 268921 条政策
 政策提纲
  • 暂无提纲
Numerical Simulation and Optimization of Hole Spacing for Cement Grouting in Rocks
[摘要] The fine fissures of V-diabase were the main stratigraphic that affected the effectiveness of foundation grout curtain in Dagang Mountain Hydropower Station. Thus, specialized in situ grouting tests were conducted to determine reasonable hole spacing and other parameters. Considering time variation of the rheological parameters of grout, variation of grouting pressure gradient, and evolution law of the fracture opening, numerical simulations were performed on the diffusion process of cement grouting in the fissures of the rock mass. The distribution of permeability after grouting was obtained on the basis of analysis results, and the grouting hole spacing was discussed based on the reliability analysis. A probability of optimization along with a finer optimization precision as 0.1 m could be adopted when compared with the accuracy of 0.5 m that is commonly used. The results could provide a useful reference for choosing reasonable grouting hole spacing in similar projects.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 应用数学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文