已收录 273496 条政策
 政策提纲
  • 暂无提纲
THE DESIGN AMD CONSTRUCTION OF THE NEW OIL PORT IN DALIAN, C.P.R.
[摘要] The construction of New Oil Port in Dalian, C.P.R., was started around the end 1974 and completed in autumn 1976.In this paper a summary of the essential considerations in design and construction of this oil port, such as the planning of the pier, the determination of exciting forces (namely wave forces, forces due to earthquake, mooring line forces and berthing forces due to the impact of tanker on the fenders)on structures, the design of the large cylindrical cassion with a diameter of 9m and a height up to 19.7m and the construction of connecting bridges by two types, is presented.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] oil port;port design;port construction;Dalian;China [时效性] 
   浏览次数:49      统一登录查看全文      激活码登录查看全文