已收录 272976 条政策
 政策提纲
  • 暂无提纲
SUBMARINE SIPHONS FOR ATHENS SEWERAGE SYSTEM
[摘要] The submarine siphons with an overall length of almost 1300 meters and an ultimate capacity of 27 cubic meters (m^) per second (about 600 million gallons per day) will be a major element of the new wastewater conveyance and treatment system presently under construction in Athen, Greece. This will help alleviate the present condition where an average of more than 6 m^ per second (130 million gallons per day) of untreated domestic and industrial wastewater are discharged into the sea near Athens. Construction of the submarine siphon pipes started in late 1984 and was completed in early 1987. Description of the data collection for and the design, manufacture and construction of these submarine siphons are presented in this paper.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] sewerage system;Athens;submarine siphons [时效性] 
   浏览次数:10      统一登录查看全文      激活码登录查看全文