已收录 268920 条政策
 政策提纲
  • 暂无提纲
COST-EFFECTIVENESS OF I) ARMOR BREAKWATER
[摘要] The cost-effectiveness of conventional and D-armor breakwaters are compared. Initial cost and capitalized anticipated damage during the lifetime of the structure are the basic elements to be considered in the economic optimization problem. A four level structural response function and a linear initial construction cost estimation are used to define the economic function. An exponential approximation to the return period of the design wave storm with an uncertainty factor is used to estimate the economic impact of the wave climate uncertainty. Finally, the adaptative design concept is introduced considering the advantages of designing for repairing and monitoring breakwaters after construction.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] cost effectiveness;armor;D-armor;breakwater [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文