已收录 268921 条政策
 政策提纲
  • 暂无提纲
BEACH IMPROVEMENT SCHEMES IN FALSE BAY
[摘要] A physical sediment model was used to design two beach improvement schemes in False Bay near Cape Town. Different layouts of T, L and detached breakwaters were tested to determine their effect on the beach and how they improved bathing conditions. Although caution was exercised to eliminate scale effects, it was found to be necessary to minimize their influences. A method was devised to do so which proved successful. It was found that equilibrium shoreline positions were reached after 4 years (prototype time). Sand feeding after construction will be necessary to minimize the deleterious effects of the breakwaters on the adjacent beaches.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] False Bay;beach improvement [时效性] 
   浏览次数:15      统一登录查看全文      激活码登录查看全文