已收录 268921 条政策
 政策提纲
  • 暂无提纲
ADJUSTMENTS TOWARD EQUILIBRIUM OF A LARGE FLOOD-TIDAL DELTA AFTER A MAJOR DREDGING PROGRAM, TAURANGA HARBOUR, NEW ZEALAND
[摘要] The Port of Tauranga is located within a tidal inlet estuarine lagoon system which has been dredged to improve navigation for shipping since 1968. In 1992 a major dredging program deepened the entrance navigation channel through the ebb-tidal delta from 10 to 14 m, and the inner harbor channels to -13 m. As a condition of the consent to dredge a detailed monitoring program was required which included annual hydrographic surveys over the flood and ebb-tidal delta as well as recording current meter records from morphodynamically sensitive locations to compare with records taken before the dredging. Results of the hydrographic surveys showed significant morphodynamic change of the flood-tidal delta had occurred essentially by the time the 6 month dredging program was completed. Comparison of the S4 current meter recordings showed current changes consistent with expectations of the EIA. Changes on the ebb-tidal delta were not expected but have occurred although not as rapidly, and seem to be ongoing.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] harbor;Tauranga Harbor;New Zealand;tidal delta;flood tide;dredging;delta equilibrium [时效性] 
   浏览次数:11      统一登录查看全文      激活码登录查看全文