已收录 268921 条政策
 政策提纲
  • 暂无提纲
OPTIMIZING DUMPING SITES NEAR DREDGED CHANNELS
[摘要] To maintain the depth of the deepwater channel of the Elbe-Waterway extensive dredging has to be done permanently. Dumping should be optimized, choosing sites near the dredging area but with a small risk of recirculation of the dumped material. In order to estimate this risk field measurements with current meters and radioactive tracer tests in field and model were carried out.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] dredged channel;dumping site;optimized dumping [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文