已收录 273512 条政策
 政策提纲
  • 暂无提纲
RUBBLE-MOUND BREAKWATER STABILITY: RESULTS OF IN-SITU MEASUREMENTS
[摘要] When the construction of the Zeebrugge Outer Harbour was finished a full scale monitoring system was realized as a part of the global monitoring and inspection programme. The monitoring system was designed to follow the water level- and the water pressure fluctuation inside and in front of the breakwater. A general description is given of the instrumentation of a section of the NW-breakwater followed by a global overview of the data-acquisition system and off-line data processing. Results from the primary analysis of the raw data of relevant storm measuring sessions are presented.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] in situ measurements;breakwater;rubble mound breakawater [时效性] 
   浏览次数:11      统一登录查看全文      激活码登录查看全文