已收录 268921 条政策
 政策提纲
  • 暂无提纲
PONTA DELGADA BREAKWATER REHABILITATION RISK ASSESSMENT WITH RESPECT TO BREAKAGE OF ARMOR UNITS
[摘要] The outer portion of the Ponta Delgada Breakwater in the Azores was constructed in the sixties, applying an armour layer of 25 t Tetrapods on a slope of 3 in 4. After two decades of recurring damage and repairs, a redesign and rehabilitation were undertaken. An armour layer of 40 t Tetrapods on a slope 1 in 2 proved to meet the more severe design wave conditions established for the rehabilitation. This was the most attractive solution from cost and constructability viewpoint. To check the risk of breakage of these units under design conditions, the rocking was analysed both in hydraulic model and by means of an analytical simulation program. This allows to assess the actual impact velocities of rocking units and the percentage breakage under given wave conditions.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] breakwater;breakwater rehabilitation;armor;armor units;risk assessment [时效性] 
   浏览次数:13      统一登录查看全文      激活码登录查看全文