已收录 268921 条政策
 政策提纲
  • 暂无提纲
DESIGN AND CONSTRUCTION OF PLEASURE CRAFT HARBOUR - CLUB MYKONOS LANGEBAAN
[摘要] A description of the pre-design investigation, design and construction of a pleasure craft harbour is given. The influence of the breakwaters on the sedimentation pattern in the direct vicinity of the harbour during construction and after completion of the harbour is described. Adaption of the design of some of the harbour components due to unforeseen circumstances revealed during the construction period is also discussed.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] harbor;pleasure craft harbor;case study;Clum Mykonos Langebaan [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文