已收录 268921 条政策
 政策提纲
  • 暂无提纲
Rehabilitation of Historic Hillhurst (Louise) Bridge
[摘要]

Precast/prestressed concrete was used very effectively from an architectural, structural, constructability and cost viewpoint to rehabilitate the 75-year-old Hillhurst (Louise) Bridge in Calgary, Alberta,  Canada. This historic five-span, spandrel wall arch structure is 172.21 m (565 ft) long with the length of each clear span equal to 32.0 m (105 ft). The total deck width is 19.6 m (64.3 ft). In the rehabilitation  ork, the following precast concrete components were used: (1) Precast, prestressed concrete deck panels; (2) Precast, concrete sidewalk support brackets; and (3) Precast concrete architectural  alustrades. Erection of the precast concrete components took only 31/2 months, finishing the project a week ahead of schedule. The total cost of rehabilitating the bridge was $5.1 million  (Canadian).

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文