已收录 268921 条政策
 政策提纲
  • 暂无提纲
Innovative Design and Erection Methods Solve Construction of Rock Cut Bridge
[摘要]

Transportation difficulties, elimination of the center pier and environmental restraints presented a major design-construction challenge for this nearly 200 ft (61 m) long bridge in a mountainous region of  Washington State. The solution was to divide the girder into three 63 ft (19.2 m) pretensioned bulb-tee girder segments and transport them 150 miles (240 km) to a staging area near the bridge site. There,  he segments were spliced and post-tensioned to give a total girder length of 190 ft 6 in. (58.1 m). The girders were then hauled to the bridge site where they were guided into position with a launching truss  and two cranes. Construction time took only 31/2 months. This article discusses the project constraints, structural design, production, transportation, splicing and fina l erection. The highlights of the project  are narrated from the perspective of the structural designer and precaster. 

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文