已收录 268921 条政策
 政策提纲
  • 暂无提纲
Design-Construction of Gannon/Goldsworthy Pedestrian Bridge
[摘要]

Precast/prestressed concrete became the solution of choice in replacing an old non-functional footbridge at Washington State University in Pullman, Washington. The new $280,000 pedestrian bridge has  spans of 24, 64, 24 ft (7.32, 19.52, 7.32 m), in which the two end spans are straight and the middle span is parabolic. Only seven precast components - three U-shaped girders and four piers -were needed to  build the structure. The end result is a magnificent bridge that is very functional, was erected on schedule with minimal disruption of traffic and was within budget. This article presents the owner's  requirements and design considerations, as well as the production, hauling, and erection highlights of the project. 

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文