已收录 268921 条政策
 政策提纲
  • 暂无提纲
Release Methodology of Strands to Reduce End Cracking in Pretensioned Concrete Girders
[摘要]

Results of numerical and experimental investigations concerning the causes of prestressed concrete girder end cracks are reported in this paper. The cracks, which developed during the flame-cutting  release process, resulted from the restraining effect of unreleased strands as the girders shortened from the partially transferred prestress and from shear stresses generated by the cutting order of the strands.  Several methods were examined to eliminate the cracks, including changes to the strand cutting pattern, debonding some of the strands in the end regions, and increasing the slope of the top surface of the bottom flange. The first two of these methods were implemented in the field and found to be successful.

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文