已收录 268921 条政策
 政策提纲
  • 暂无提纲
Design and Construction of Cable-Stayed Bridges in the Czech Republic
[摘要]

The author discusses the design, analysis and construction of two innovative precast, prestressed concrete cable-stayed bridges recently built in the Czech Republic. The first bridge was built across the  Elbe River near Podebrady and the second bridge was built over a major railroad junction in Prague- Vrsovice. The decks of these bridges comprise a spine box girder assembled of precast, match-cast  segments and cast-in-place overhangs supported by precast concrete struts. External prestressing was used to strengthen the deck. To confirm the validity of the design, a static and dynamic analysis of the  structural system was conducted together with model testing. The author shows how this system, with some modification, can be applied to other cable-stayed and segmental concrete bridges. 

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:4      统一登录查看全文      激活码登录查看全文