Post-tensioned Tendon Losses in a Spliced-Girder Bridge, Part 1: Field Measurements
[摘要]

As part of the reconstruction of Interstate 15 through Salt Lake City, Utah, the bridge over 4500 South Street was built with a segmental section using the new Washington State Department of  Transportation precast concrete deep girder design. The northbound bridge consists of eight post-tensioned, spliced, precast concrete girders that have three segments each, for a single clear span of 61.44   (201.6 ft). Four girders and portions of the bridge deck and parapet wall were instrumented and monitored for three years and eight months. Data recorded from the bridge included concrete strain   at selected girder locations and girder post-tensioned losses and deflections for one of the girders. At the  end of the monitoring period, the actual losses at midspan in the instrumented girder     (including time-dependent losses and anchorage seating and friction  losses) were on average 14.5% of the initial post-tensioning force. The absolute upward midspan  deflection was 0.15% of the clear    span, and the two splice points exhibited almost identical deflection,  indicating excellent girder/splice continuity performance. This paper describes the instrumentation and field measurements of the  monitoring  study. Part 2 of this paper, which will appear in the July–August 2007 issue of the PCI Journal, will present the analysis of losses.

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:4      统一登录查看全文      激活码登录查看全文