已收录 268920 条政策
 政策提纲
  • 暂无提纲
Precast Concrete Canopy Offers Innovative Design and Fast Track Construction
[摘要]

The canopy for the Port of Miami Terminals 3, 4, and 5 in Miami, Florida, provides shelter for embarking and disembarking cruise ship passengers as they transfer to buses, taxis and cars. Precast/prestressed concrete proved to be the fastest and least expensive solution to an innovative architectural and structural design. By creatively combining and connecting the precast components  together, the elegant lines and soaring architectural motif intended by the architect was achieved on the fast track construction schedule demanded by the owner. This article presents the architectural  features, structural design considerations and construction highlights of the project.

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文