Describes the design, production and erection of a five-span post-tensioned concrete segmental I-beam bridge with a total length of 542ft (165m), located at Fort Knox, Kentucky. The 160ft (49 m) central span was cast in two segments and spliced at the bridge site. For the deck, stayin- place precast prestresse concrete panels were used.