已收录 268921 条政策
 政策提纲
  • 暂无提纲
Rehabilitation of Wellman Ditch Project
[摘要]

For 25 years, excessive soil overburden severely overloaded the precast prestressed double tee roof over a drainage ditch near a family  housing complex. The ductility and reserve strength of the double  tees permitted the installation of permanent shoring to economically reduce the stresses in the roof to  within safe limits.

[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文