已收录 273081 条政策
 政策提纲
  • 暂无提纲
THE FOUNDATION OF SAGA PREFECTURAL HOSPITAL
[摘要] A five-storied hospital building with basement was constructed on soft clayey deposits. Based on the results of soil exploration, the raft foundation was placed on compressible clay pre-consolidated by vertical sand drains and well-points. The excavation for the basement was performed successfully and the building showed practically no differential settlement after it had been completed. The paper presents a brief summary of the technical report on the design and construction of the foundation of that hospital building.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文