THE FOUNDATION OF SAGA PREFECTURAL HOSPITAL
[摘要] A five-storied hospital building with basement was constructed on soft clayey deposits. Based on the results of soil exploration, the raft foundation was placed on compressible clay pre-consolidated by vertical sand drains and well-points. The excavation for the basement was performed successfully and the building showed practically no differential settlement after it had been completed. The paper presents a brief summary of the technical report on the design and construction of the foundation of that hospital building.
[发布日期] [发布机构]
[效力级别] [学科分类] 建筑学
[关键词] [时效性]