Investigation of air concentration and pressures of a stepped spillway equipped with a crest pier
[摘要] ENGLISH ABSTRACT: The evolution of roller compacting concrete has led to stepped spillways becoming increasingly popularover recent decades, mainly credited to the fact that the stepped profile of the downstream dam wallcan be incorporated into a spillway chute. However, the discharge over stepped chutes in current usehas been limited, due to the risk of local cavitation damage to the concrete of stepped chute structures.A general accepted practice to combat cavitation is to aerate the flow. Would it be possible, when addinga pier to the spillway crest, to introduce air into the flow upstream of the inception point in order to reducethe cavitation potential on the chute, and subsequently allow discharges greater than the currentrecommended values to be safely passed?A physical hydraulic model was constructed at a scale of 1:15 to investigate the air concentration alongthe pseudo-bottom and minimum pressures at the upper vertical step face for areas on the spillwaychute where cavitation could be imminent for large discharges. The tests were conducted using aconventional stepped spillway with no pier as the control, to which the test results of two different pierconfigurations fixed on the spillway crest were compared.The recorded results showed an increase in air concentration and minimum pressures downstream ofthe pier for both tested crest pier designs. The Type 1 pier is recommended over the Type 2 pier due tothe increased ability of the former pier to aerate the flow that consequently alleviates minimum pressuresfound on the spillway chute.In summary, the literature recommends a maximum discharge of 18 m²/s, but the experimental studyhas shown through a cavitation evaluation of the air concentration and minimum pressures that, for ano-pier stepped spillway with a chute angled at 51.3° and a prototype step height of 1.5 m, a maximumdischarge of up to 25 m²/s can be allowed. For a spillway equipped with a Type 1 pier, Method Asuggested that a unit discharge of at least 30 m²/s could be safely passed.
[发布日期] [发布机构] Stellenbosch University
[效力级别] [学科分类]
[关键词] [时效性]