已收录 268921 条政策
 政策提纲
  • 暂无提纲
DESIGN OPTIMIZATION OF EAST LONDON FORESHORE PROTECTION DURING CONSTRUCTION
[摘要] Transnet Group Capital (TGC) was appointed by Transnet National Ports Authority (TNPA) to manage construction of a revetment at East London Foreshore in East London, South Africa. The revetment construction was initiated to halt a 40 m regression of the reclaimed land between the grain elevator and the sea. This area accommodates the access road to the terminus yard as well as the rail lines that serve the grain elevator.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文