已收录 268921 条政策
 政策提纲
  • 暂无提纲
Reentrant Flow Shop Scheduling considering Multiresource Qualification Matching
[摘要] With the development of technology and industry, new research issues keep emerging in the field of shop scheduling. Most of the existing research assumes that one job visits each machine only once or ignores the multiple resources in production activities, especially the operators with skill qualifications. In this paper, we consider a reentrant flow shop scheduling problem with multiresource considering qualification matching. The objective of the problem is to minimize the total number of tardy jobs. A mixed integer programming (MIP) model is formulated. Two heuristics, namely, the hill climbing algorithm and the adapted genetic algorithm (GA), are then developed to efficiently solve the problem. Numerical experiments on 30 randomly generated instances are conducted to evaluate the performance of proposed MIP formulation and heuristics.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 软件
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文