已收录 268921 条政策
 政策提纲
  • 暂无提纲
S-curve modelling in early phases of construction projects
[摘要] The methodological procedure for forecasting cost distribution over time is given for the project realization phase using cost s-curves for three different types of structures: building, tunnel, and motorway. Three different approaches are used, and their
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] construction planning;cost scheduling;building engineering;tunnels;motorways;S-curve;regression models [时效性] 
   浏览次数:11      统一登录查看全文      激活码登录查看全文