已收录 268921 条政策
 政策提纲
  • 暂无提纲
Closure of tailings facilities: Current practice review and guidelines for success
[摘要] This research project has been prepared to satisfy the requirements of the University of theWitwatersrand, Faculty of Engineering and the Built Environment for the degree of Master ofScience (Civil) in Geotechnical Engineering and Materials (50/50).Contained within the project is a review of international past and current tailings facilityclosure techniques. Guidelines and minimum requirements for successful closure havebeen developed and are presented.
[发布日期]  [发布机构] University of the Witwatersrand
[效力级别]  [学科分类] 
[关键词]  [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文