Three-Phase Wet Sour Gas Transmission in a Pipeline
[摘要] The basis of a wet process scheme involves minimum offshore processing. The reservoir fluid is collected on a wellhead platform and routed without treatment via a three-phase subsea pipeline to the shore where it is processed to deliver gas and condensates at specifications. The concept and design will be applied to produce wet sour gas transmission from offshore to shore via a subsea pipeline, resulting in a lower capital investment. As a consequence two highly undesirable situations can exist at the same time, severe corrosion and hydrate blockage, leading to system failure and the complete shutdown of production. Therefore, both corrosion and hydrate inhibitors can be required to effectively treat these phenomena. A solution of monoethylene glycol (MEG) is used for hydrate prevention and an amine (methyldiethanolamine [MDEA]) will be added as a buffering agent to maintain pH at a neutralizing value to managed corrosion. This requires proper quality assurance of topside and subsea pipelines but will result in lower capital costs as well as lower operational costs. In the proposed “Three-Phase Wet Sour Gas Transmission in a Pipeline”, excellent engineering team will focus on the application of a pH control system for carbonate reservoirs in order to prevent scaling.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 分析化学
[关键词] Multi-Phase flow;Carbonate reservoirs;Hydrate Formation;pH Stabilization;Scaling [时效性] 
   浏览次数:5      统一登录查看全文      激活码登录查看全文