Maharashtra Comprehensive Policy for Grid-connected Power Projects based on New and Renewable (Nonconventional) Energy Sources
[摘要] Total of 14,400 MW capacity power projects based on new and renewable energy sources are targeted to be installed in the next 5 years. Overall targets: 5000 MW of Wind Power Projects; 1000 MW of Bagasee-based Co-generation Projects; 400 MW of Small Hydro Projects; 300 MW of Biomass-based Power projects; 200 MW of Industrial Waste-based Power Projects; 7500 MW of Solar Power Projects.
[发布日期] 2015-01-01 [发布机构]
[效力级别] [学科分类] 全球变化
[关键词] [时效性]