Integrated Resource Electricity Plan 2010 – 2030 South Africa 2011
[摘要] The 2010 update of the IRP aims to install 17.8GW of renewable power capacity between 2010 and 2030. This is 42% of the total new generation capacity to be installed during the same period. The current iteration of the Integrated Resource Plan (IRP) for South Africa, initiated by the Department of Energy (DoE) after a frrst round of public participation in June 2010, led to the Revised Balanced Scenario (RBS) that was published in October 20 I 0. It laid out the proposed generation new build fleet for South Africa for the period 2010 to 2030. This scenario was derived based on the cost-optimal solution for new build options (considering the direct costs of new build power plants), which was then "balanced" in accordance with qualitative measures such as local job creation. In addition (new capacity) to all existing and committed power plants, the RBS included a nuclear fleet of 9,6 GW; 6,3 GW of coal; 11,4 GW of renewables (excl hydro); and 11,0 GW of other generation sources.
[发布日期] 2011-01-01 [发布机构] 
[效力级别]  [学科分类] 全球变化
[关键词]  [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文