The Growth and Transformation Plan (GTP) Ethiopia 2010
[摘要] Executive To increase the generating renewable energy capacity from 2000 MW to 8 GW – 10 GW by the end of 2015. GTP I has been superseded by GTP II (2016-2020) (http://climatepolicydatabase.org/index.php/Growth_and_Transformation_Plan_II_(GTP_II)_2016-2020)
[发布日期] 2010-01-01 [发布机构]
[效力级别] [学科分类] 全球变化
[关键词] [时效性]