已收录 268921 条政策
 政策提纲
  • 暂无提纲
Operational Readiness Review Implementation Plan for K Basin Sludge Water System.
[摘要] The purpose of this ORR is to confirm the contractor's ability to safely start Sludge Waster System (SWS) operations in the K-East Basin North Loadout Pit (NLOP) and the readiness of Richland Operations Office (RL) line organization to effectively oversee the contractor. This Implementation Plan provides the overall approach and guidelines for performance of the DOE ORR at KE Basin for the NLOP activity. A separate Implementation Plan will be developed for the DOE ORR at the Radiochemical Processing Laboratory (RPL) or an alternate facility selected to treat or store the sludge packaged in the Large Diameter Containers (LDCs). Appendix A contains the Criteria and Review Approach Documents (CRADs), which define the review objectives and criteria, as well as the approach for assessing each objective. ORR results will be published in a final report.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Radioactive waste management;Performance;Sludges;Fuel storage pools;Waste retrieval [时效性] 
   浏览次数:59      统一登录查看全文      激活码登录查看全文