已收录 273496 条政策
 政策提纲
  • 暂无提纲
Conceptual Design Plan for SM-43 Replacement Project.
[摘要] The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Replacing;Decision making;LANL;Design criteria;Scheduling [时效性] 
   浏览次数:46      统一登录查看全文      激活码登录查看全文