已收录 273081 条政策
 政策提纲
  • 暂无提纲
Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System Step 1: Review and Critique of Implementation Plans.
[摘要] The Bonneville Power Administration, Corps of Engineers, and Bureau of Reclamation (Action Agencies) will be developing 1- and 5-year implementation plans for the Draft Biological Opinion on Operation of the Federal Columbia River Power System developed by the National Marine Fisheries Service. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards for the Biological Opinion. The first step for developing the implementation plan was to determine the organizational structure of the plan. A review of implementation plans concerning natural resource management was conducted to evaluate the elements of plans and determine the applicability of the best elements to the draft implementation plan.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Fishes;Natural resources management;Implementation;Planning;Performance [时效性] 
   浏览次数:18      统一登录查看全文      激活码登录查看全文