已收录 272893 条政策
 政策提纲
  • 暂无提纲
Operational Test Report for S-109 Pumping Instrumentation and Control Kid 'B'.
[摘要] This Operational Test Report (OTR) provides the test results for the operational testing of S-109 Pumping, Instrumentation and Control Skid 'B'. The OTR summarizes the results and provides a completed and signed copy of the OTP in the Appendix.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Radioactive wastes;Storage facilities;Pumps;Measuring instruments;Performance testing [时效性] 
   浏览次数:29      统一登录查看全文      激活码登录查看全文